15. Tamper/security sealings — Valves for venting, pressure equalization, differential pressure – open and sealed?REQ
16
16. Electrical equipment — General visual inspection of electrical installationsREQ
17
17. Earth straps/rods for tanks, filter and pipework — Check the condition and resistance less than 10 ohmREQ
18
18. Lightning/illumination — Check operation and adequacyREQ
19
19. Overfill protection - Tank 1 — Type High-HighREQ
20
19. Overfill protection - Tank 1 — Closing timeREQ
s
21
19. Overfill protection - Tank 1 — Warmup timeREQ
s
22
20. Overfill protection - Tank 2 — Type High-HighREQ
23
20. Overfill protection - Tank 2 — Closing timeREQ
s
24
20. Overfill protection - Tank 2 — Warmup timeREQ
s
25
21. Tank 1 — Microbiological testREQ
26
21. Tank 1 — ConductivityREQ
pS/m
27
21. Tank 1 — Floating suctionREQ
28
21. Tank 1 — SampleREQ
29
21. Tank 1 — Last cleaned dateREQ
30
21. Tank 1 — Last inspected dateREQ
31
21. Tank 1 — Mechanical and internal cleanliness inspection — Visual inspection and cleanliness assessment from the manhole; record any dirt, water, microbial growth, or other deviations on a separate sheetREQ
32
21. Tank 1 — Internal cleaning (carried out on condition) — See JIG 4, 6.3.4 for causes for tank cleaningREQ
33
21. Tank 1 — Manhole covers and gauge hatchesREQ
34
21. Tank 1 — Pressure/vacuum relief valvesREQ
35
21. Tank 1 — Periodic test (static stock) — Only required if tank has no product receipts for 6 monthsREQ
36
21. Tank 1 — Vents and meshREQ
37
22. Tank 2 — Microbiological testREQ
38
22. Tank 2 — ConductivityREQ
pS/m
39
22. Tank 2 — Floating suctionREQ
40
22. Tank 2 — SampleREQ
41
22. Tank 2 — Last cleaned dateREQ
42
22. Tank 2 — Last inspected dateREQ
43
22. Tank 2 — Mechanical and internal cleanliness inspection — Visual inspection and cleanliness assessment from the manhole; record any dirt, water, microbial growth, or other deviations on a separate sheetREQ
44
22. Tank 2 — Internal cleaning (carried out on condition) — See JIG 4, 6.3.4 for causes for tank cleaningREQ
45
22. Tank 2 — Manhole covers and gauge hatchesREQ
46
22. Tank 2 — Pressure/vacuum relief valvesREQ
47
22. Tank 2 — Periodic test (static stock) — Only required if tank has no product receipts for 6 monthsREQ
48
22. Tank 2 — Vents and meshREQ
49
23. Product recovery tank — SampleREQ
50
23. Product recovery tank — Empty and wipe dryREQ
51
23. Product recovery tank — Overfill protection — Check the function and any alarmsREQ
52
24. Bonding wires — Measure resistance (max 25 ohm), check the condition of the clamp, cable, and connection pointREQ
ohm
53
25. Bucket with bonding wire — Measure resistance (max 25 ohm), check the condition of the clamp, cable, and connection pointREQ
ohm
54
26. Hose - Depot loading — TypeREQ
55
26. Hose - Depot loading — Manufactured dateREQ
56
26. Hose - Depot loading — CouplingsREQ
57
26. Hose - Depot loading — Serial numberREQ
58
26. Hose - Depot loading — Test pressureREQ
bar
59
26. Hose - Depot loading — ConditionREQ
60
27. Hose - Fueller loading — TypeREQ
61
27. Hose - Fueller loading — Manufactured dateREQ
62
27. Hose - Fueller loading — CouplingsREQ
63
27. Hose - Fueller loading — Serial numberREQ
64
27. Hose - Fueller loading — Test pressureREQ
bar
65
27. Hose - Fueller loading — ConditionREQ
66
28. Flexible joint - Before pump — Check condition and signs of leakageREQ
67
28. Flexible joint - After pump — Check condition and signs of leakageREQ
68
28. Flexible joint - After filter C1 — Check condition and signs of leakageREQ
69
28. Flexible joint - After filter C2 — Check condition and signs of leakageREQ
70
28. Flexible joint - From C1-C2 — Check condition and signs of leakageREQ
71
29. Coupling - Depot loading — ModelREQ
72
29. Coupling - Depot loading — SizeREQ
73
29. Coupling - Depot loading — Dust capREQ
74
30. Coupling - Fueller loading — ModelREQ
75
30. Coupling - Fueller loading — SizeREQ
76
30. Coupling - Fueller loading — Dust capREQ
77
31. Filter — Type and serial numberREQ
78
31. Filter — First stage - Element and quantityREQ
79
31. Filter — Second stage - Element and quantityREQ