LOADING
fr-f98599ad · started 2026-07-25 08:57 by Unknown user · JIG 4 / DEF STAN 91-091 / AFQRJOS
FUEL RECEIPT · STEPS 1–4 · JIG 4
Before the bridger arrives — all mandatory
Just before bridger arrives
Take samples from bridger and compare @15°C
The CoA / CoQ / CoC that came with the batch. Scan it, upload it, or type it in.
Still to record: certificate number, batch, issue date.
After settling for minimum 60 min
Formal release of fuel for operational use
| DETAIL | PREVIOUS | RECEIVED | AFTER BLEND |
|---|---|---|---|
| Batch no | — | — | — |
| Density kg/l | 800.000 | 790.000 | 0.7943 |
| Volume L | 15,000 | 20,000 | 35,000 |
Certification statement · It is certified that all of the products detailed hereon have been inspected, tested and, unless otherwise stated, conform in all respects with the requirements of the JIG 4 standards.