fr-e62ff752 · started 2026-07-27 16:20 by Unknown user · JIG 4 / DEF STAN 91-091 / AFQRJOS
FUEL RECEIPT · STEPS 1–4 · JIG 4
Before the bridger arrives — all mandatory
Just before bridger arrives
Take samples from bridger and compare @15°C
The CoA / CoQ / CoC that came with the batch. Scan it, upload it, or type it in.
A SAF blend is certified in two parts — the neat component to ASTM D7566 and the finished blend to D1655 / DEF STAN. Record the component here.
Still to record: certificate number, batch, issue date.
After settling for minimum 60 min
Formal release of fuel for operational use
| DETAIL | PREVIOUS | RECEIVED | AFTER BLEND |
|---|---|---|---|
| Batch no | — | — | ESSB-000011-FF01-T01 |
| Density kg/l | — | — | — |
| Volume L | — | — | — |
| DETAIL | PREVIOUS | RECEIVED | AFTER BLEND |
|---|---|---|---|
| Batch no | — | — | ESSB-000012-FF01-T02 |
| Density kg/l | — | — | — |
| Volume L | — | — | — |
Certification statement · It is certified that all of the products detailed hereon have been inspected, tested and, unless otherwise stated, conform in all respects with the requirements of the JIG 4 standards.