LOADING
fr-adc0c4a4 · started 2026-07-26 11:55 by Unknown user · JIG 4 / DEF STAN 91-091 / AFQRJOS
FUEL RECEIPT · STEPS 1–4 · JIG 4
Before the bridger arrives — all mandatory
Just before bridger arrives
Excluded from this delivery — skipped in steps 2–4 and on the certificate.
Take samples from bridger and compare @15°C
The CoA / CoQ / CoC that came with the batch. Scan it, upload it, or type it in.
Still to record: certificate number, batch, issue date.
After settling for minimum 60 min
Formal release of fuel for operational use
| DETAIL | PREVIOUS | RECEIVED | AFTER BLEND |
|---|---|---|---|
| Batch no | — | — | — |
| Density kg/l | — | — | — |
| Volume L | — | — | — |
Certification statement · It is certified that all of the products detailed hereon have been inspected, tested and, unless otherwise stated, conform in all respects with the requirements of the JIG 4 standards.