Tank Release Certificate
Fuel receipt & release · JIG 4 (latest issue) · DEF STAN 91-091 (latest issue) · AFQRJOS (latest issue)
Jet A-1
DRAFT — NOT RELEASED
Procedure record · steps 0–4
0Pre-arrival safety checks
10 of 10 completed ✓
| All checks | Completed before the bridger arrived |
1Tank status before delivery
1 tank in this delivery
| Tank 2 | batch SAAB-1-22 · 15,000 L · 0.8000 kg/l · ullage 20,000 L |
2Acceptance check before unloading
Not authorised
| Delivery documents | 0 of 5 verified — missing: Tank Release Certificate received, Goods declaration (godsdeklaration) received, Delivery note (lastrapport) received, Delivery seals not broken, Product corresponds to order — not met |
| Bridger sample | no density · no conductivity · appearance not accepted · water detected · sediment detected — not met |
| Density vs declared | — |
| Quantity received | — L declared · batch — |
3Settling and tests
Minimum settling 60 min
| Tank 2 | settled — · no density · no conductivity · appearance not accepted · water detected · sediment detected — not met |
4Tank release
Criteria not met
| Tank 2 | new batch ESSB-000004-FF01-T02 · released — · authorised by — — not met |
Tank 2New batch no: ESSB-000004-FF01-T02
Batch no
- In tank
- SAAB-1-22
- Received
- —
- After blend
- ESSB-000004-FF01-T02
Density @15°C (kg/l)
- In tank
- 0.800
- Received
- —
- After blend
- —
Volume (litres)
- In tank
- 15,000
- Received
- —
- After blend
- —
| Detail | Previous / in tank | Received | After blend |
|---|
| Batch no | SAAB-1-22 | — | ESSB-000004-FF01-T02 |
|
Certification statement · It is certified that all of the products detailed hereon have been inspected, tested and, unless otherwise stated, conform in all respects with the requirements of the JIG 4 standard, DEF STAN 91-091 (latest issue) and AFQRJOS (latest issue).
Density tolerance requirement
±0.003 kg/l
(± 3 kg/m³) theoretical vs actual prior to release
Draft — not yet releasedMaintenancelinked · Stockholm-Bromma · Page 1 of 1